Conair Hopper Temperature Controller UGD031 User Manual Page 22

  • Download
  • Add to my manuals
  • Print
  • Page
    / 97
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 21
3-2 l Installation
Unpacking the Boxes
The HTC process air heater comes in two boxes. Depending on the model and
options ordered, the boxes could include:
Standard Equipment
Heater assembly;
Control center;
1 insulated hose;
1 non-insulated hose;
4 hose clamps;
2 RTD probes (1 process and 1 process protection);
Blower (HAD models only).
Optional Equipment
1 RTD probe (1 setback).
1 Carefully remove all components from their shipping containers.
2 Remove all packing material, protective paper, tape, and plastic.
3 Carefully inspect all components
to make sure no damage occurred during
shipping, and that you have all the necessary hardware.
4 Take a moment to record serial numbers and electrical power specifications
in the blanks provided on the back of the the User Guide’s title page. The infor-
mation will be helpful if you ever need service or parts.
5 You are now ready to begin installation. Follow the preparation steps on the
next page.
Page view 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 96 97

Comments to this Manuals

No comments