EMC Report No: 3109178NYM-005
Page 17
5.2.7 EN 61000-4-11 Voltage Dips and Interruptions
The test sample was connected to the test equipment, as shown in Figure 5.2.7, and monitored for
performance. The EUT shall be tested for each selected combination of test level and duration with a
sequence of three dips/interruptions with intervals of 10 seconds minimum between each event. Each
representative mode of operation shall be tested.
For three-phase systems, phase-by-phase test is preferred. In certain cases e.g. three-phase meters and three-
phase power-supply equipment, all the three phases must be simultaneously tested. In the case of
simultaneous application of dips or interruptions on all three phases, the zero crossing condition of the voltage
will be fulfilled only on one phase.
Figure 5.2.7 Power Line Voltage Drops and Interrupts Susceptibility
Voltmeter
Oscilloscope
EUT
Power Amplifier
Wave-Form
Generator
Controller
Phase
Neutral